A 150 KWp Photovoltaic Grid Connected Solar Power Plant, installed inside the Hatamuniguda Ashrama campus, under the CSR initiative of ONGC. It was inaugurated on 3rd October 2021 by Shri Saroj Kumar Mishra, Collector and District Magistrate, Rayagada in the presence of Swami Atmaprabhananda, Adhyaksha, Ramakrishna Math, Bhubaneswar.
A small meeting was organized on this occasion, following the Covid-19 protocol, which was attended by selected students, teachers and members of the ashrama Managing Committee.